Doing Business in Forest Grove: Fees & Permits
System Development Charges (SDCs) & Connections (2010)
Transportation Development Tax (TDT) SDC:
Depends on type of use—contact Planning Department for estimate
Water SDC:
Based on meter size: Drop In or Full Service
| ¾” | $4,055 |
| 1” | $10,138 |
| 1 ½” | $20,275 |
| 2” | $32,439 |
| 3” | $64,879 |
| 4”-10” available | see schedule |
- Connection Fee if City performs work. Fee based on meter size
- Fire Service Fee: 2” and smaller approximately $1,000; over 2” approximately $2,000
Sewer SDC:
$4,500 per each Dwelling Unit Equivalent (DUE) 16 fixture counts = 1 DUE
Connection Fee of $2,800 per DUE if City performs work
Stormwater Management SDC:
$500 per ESU ($225/ESU for water quality, $275/water quantity).
2,540 s.f. of impervious surface = 1 ESU. SDC in lieu of construction of on-site facilities is $15,000.
Park SDC:
No SDC for Commercial or Industrial properties
Business License
There is a one-time set-up fee and an annual fee based on the number of employees. The fees are non-refundable. See Business Licenses for more information.
| BUSINESS LICENSE FEES | (Effective Oct 1, 2008) |
|---|---|
|
First Time Application Fee |
$25.00 |
| ANNUAL RENEWAL | |
|
Businesses with 0 to 2.5 employees |
$35.00 |
|
Businesses with 3 to 4.5 employees |
$50.00 |
|
Businesses with 5 to 10.5 employees |
$75.00 |
|
Businesses with 11 to 50.5 employees |
$100.00 |
|
Businesses with 51 or more employees |
$100.00 plus $1/employee over 50 |
| Capped at $250.00 annually | |
| TEMPORARY/TRANSCIENT BUSINESSES | |
|
First Time Application Fee |
$25.00 |
|
Up to 30 days of operation |
$15.00 |
|
Between 31 and 60 days of operation |
$30.00 |
|
Over 61 days of operation |
Treated as a business |
Forest Grove School District Construction Excise Tax (CET)CET is 50¢ per s.f. up to a cap on new construction of $25,000 for commercial and industrial projects.
Planning & Building Permits & Fees (2010)
| Site Plan Review – Non-Residential | $66.00/hr + $3,000 deposit |
| Conditional Use | $66.00/hr + $2,250 deposit |
| Preliminary Partition | $1,075 |
| Final Partition | $325 |
| Preliminary Subdivision | $66.00/hr + deposit of $1,950 +$67.00/lot over 3 lots |
| Final Subdivision | $765 |
| Variance from Regulations | $66.00/hr + $1,950 deposit |
| Building Permit Fees | Based on valuation, follows State of Oregon Building Codes Division Fee Schedule Permit for $500,001 $1,000,000 building =$2,974 + $4.40 for each additional $1,000 or fraction thereof. Permit for $1,000,001 and up =$5,174.85 for first 1,000,000 + $2.85 for each additional $1,000 or fraction thereof. |
| Building Plan Review Fee | 65% of Building Permit Fee |
| F&L Safety Plan Review Fee | 40% of Building Permit Fee |
| Plumbing Permit Fee | 25% of Building Permit Fee |
| Mechanical Permit Fee | 25% of Building Permit Fee |
Contact:
Jeff King, City of Forest Grove, (503) 992-3293