Create a Website Account - Manage notification subscriptions, save form progress and more.
The homeowner should consult with a certified solar contractor to confirm their home is a proper candidate for a solar panel array installation
When consulting with your solar contractor, be prepared to supply them with a minimum of 12 months worth of power usage, as well as the cost of your per kWh energy charge. This information determines the panel install payback period or how long you realize a profit from your investment.
Discuss with your installer the possibility of receiving Federal, State, or City of Forest Grove Light & Power current rebates or incentives.
Upon confirmation of moving ahead with an installation, review the City of Forest Grove Light & Power Interconnection Standards and complete the Level 1 Interconnection Application.
Once you Level 1 application is approved by FGL&P, installation may occur.
A Washington County electrical inspector should be scheduled for approval. After approval, contact Forest Grove Light & Power to schedule a witness test.
Upon the completed and approved witness test, Forest Grove Light & Power will replace your existing meter with a bi-directional read new meter., completing your installation commencing service immediately.
This field is not part of the form submission.
* indicates a required field